Day Five of the seal coating project is scheduled for Friday, August 11th.  The below streets will be closed for a 24-hour period so that the seal coat can be applied and have time to dry.  All travel and parking on these streets will be prohibited during this time.  

DAY 5 – Friday, August 11th  

  • Bronstein Lane (between Lois Lane & behind 42552 Ringneck)
  • Christopher Thomas Lane (between Minerva & behind 23235 Christopher Thomas)
  • Claxton Terrace
  • Grayling Terrace
  • Hideaway Lane (except behind 23432 Gardenwalk Dr.)
  • Joya Lane
  • Orangetip Terrace
  • Spice Bush Terrace (between Twin Falls and in front of 23428 Spice Bush Terr)
  • Stalwart Alley (between East side of Stalwart Alley and behind 42485 Ringneck Pl)
  • Tourmaline Alley (between Ringneck Pl and 42469 Spring Splendor Dr)
  • Travertine Alley
  • Twin Falls Terrace

Please review MAP and the above listed “Orange” streets that will be closed. 
 
RELOCATING VEHICLES: Vehicles remaining on these streets after 7:00 AM will be relocated to a nearby street by a tow company or the Brambleton Town Center. Vehicles in residents’ driveways and garages will also need to be relocated by the owners if they plan or need to use their vehicle during the 24-hour road closure period. Vehicles can be relocated to Creighton Elementary School parking lot or a nearby street not impacted by the seal coating. **Please be cautious of parking vehicles on other BCA streets that are scheduled to be seal coated, as similar restrictions and relocation efforts will also take place. 

TRASH – Service on these streets will take place between 6:00 and 7:00am.  Be sure to place cans and toters out accordingly.  

ACCESS TO STREETS:  All access to the streets during this time is restricted.  Freshly applied seal coating will track.  Be sure to stay off the streets.  If applicable, educate and inform your children; also keep your pets off.  BCA will place plywood down in strategic locations to serve as crossing points for pedestrians.  

IRRIGATION SYSTEMS: If applicable, residents must turn off their irrigation systems during this 24-hour period.  Wet streets or water sprayed onto freshly seal coated street will negatively impact the application.  BCA will also be turning its systems off in the area of the treated streets.  

FURTHER INFORMATION: It is important that all affected residents understand how they will be impacted.  Please review the full information packet that was distributed to all impacted addresses.  This information is also on the BCA website at www.BrambletonHOA.com/asphalt.   If you have questions after reading this information, please email BCA's Capital Projects Coordinator at CIP@brambleton.org