Asphalt Seal Coating Project: Group Five

Group Five of the seal coating project is scheduled for Wednesday, September 20th.  The below streets will be closed for a 24-hour period so that the seal coat can be applied and have time to dry. All travel and parking on these streets will be prohibited during this time.  

Group 5 – Wednesday, September 20th  

  • Bronstein Lane (between Lois Lane & behind 42552 Ringneck)
  • Christopher Thomas Lane (between Minerva & behind 23235 Christopher Thomas)
  • Claxton Terrace
  • Grayling Terrace 
  • Hideaway Lane (except behind 23432 Gardenwalk)
  • Joya Lane
  • Orangetip Terrace
  • Spice Bush Terrace (between Twin Falls & in front of 23428 Spice Bush Terr)
  • Stalwart Alley (between East side of Stalwart Alley & behind 42485 Ringneck Pl)
  • Tourmaline Alley (between Ringneck Pl & 42469 Spring Splendor Dr)
  • Travertine Alley
  • Twin Falls Terrace

Please review MAP and the above listed “Orange” streets that will be closed.  

TRAILS: The trails north of Ryan Road and the Belmont Trace trails will be seal coated as part of either Group Five or Six.  Please remain aware of signage and closures when traveling these areas.

RELOCATING VEHICLES: Vehicles remaining on these streets after 7:00 AM will be relocated to a nearby street or the Brambleton Town Center by a tow company. Vehicles in residents’ driveways and garages will also need to be relocated by the owners if they plan or need to use their vehicle during the 24-hour road closure period. **Please be cautious of parking vehicles on other BCA streets that are scheduled to be seal coated, as similar restrictions and relocation efforts will also take place. 

ACCESS TO STREETS:  All access to the streets during this time is restricted.  Freshly applied seal coating will track.  Be sure to stay off the streets.  If applicable, educate and inform your children; also keep your pets off.  BCA will place plywood down in strategic locations to serve as crossing points for pedestrians.  

IRRIGATION SYSTEMS: If applicable, residents must turn off their irrigation systems during this 24-hour period.  Wet streets or water sprayed onto freshly seal coated street will negatively impact the application.  BCA will also be turning its systems off in the area of the treated streets.  

FURTHER INFORMATION: It is important that all affected residents understand how they will be impacted.  Please review the full information packet that was distributed to all impacted addresses.  This information is also on the BCA website at www.BrambletonHOA.com/asphalt.   If you have questions after reading this information, please email BCA's Capital Projects Coordinator at CIP@brambleton.org